MINING
  • Modernization of Coal Preparation Plant for "Marcel" Coal Mine
  • Shaft tower rectification of shaft P V as well as arrangement of rope pulleys geometry for KGHM "Polska Miedź" S.A.
  • Shaft III disposal including belong objects on surface in "Staszic" Coal Mine
  • Modernization of Coal Preparation Plant near main shafts for "Knurów" Coal Mine as General Contractor
  • Continuation of shaft no. 8 building for "Jankowice" Coal Mine
  • Replacement of 6000 mm top bi-rope pulley on Grunwald IV shaft tower for "Halemba" Coal Mine
  • Rebuilding of shank tower adapting existing construction  for building of elongated servo - motors for "Budryk" Coal Mine
  • Execution of equipment near shafts on 1000 m level - shaft VI for "Bielszowice" Coal Mine
  • Modernization of jig washer in Coal Preparation Plant in range of 2 fine coal jigges OM24D for "Pniówek" Coal Mine
  • Machines and equipment demolition on "Morcinek" Coal Mine area as well as their transport and assembly on "Bogdanka" S.A. Coal Mine area
  • Transfer of Coal Recovery Plant from Trachy to Buków town for Gwarex Ryan Poland
  • Equipment modernization of pre-classification in complex object no. 3.1 for "Borynia" Coal Mine
  • Replacement of fi 5000 bi-rope pulleys set on hoist tower of shaft no. 1.2 for Lubelski Węgiel "Bogdanka"
  • Modernization of equipment near shafts of "JAS I" shaft north way for "JAS - MOS" Coal Mine
  • Emergency replacement of west rope pulley bearing on shaft tower no. IIB for "Chwałowice" Coal Mine
  • Repair of steel contruction level +10 m to +14 m in shaft top building of shaft no. 2 and sorting plant of Coal Preparation Plant for "Ziemowit" Coal Plant
  • Modernization of system I pre-classification of Coal Preparation Plant for "Budryk" Coal Mine
  • Emergency repair of "Bolesław" shaft tower in "Bytom" III Mine Plant
  • Repair of "Szewczyk" shaft tower for "Ziemowit" Coal Mine
  • Platforms repairs in Recovery Plants - "Piast" Coal Mine, "Brzeszcze" Coal Mine, "Jankowice" Coal Mine, "Staszic" Coal Mine, "Wieczorek" Coal Mine, "Anna" Coal Mine etc.
  • Beam replacement of "Michał" shaft tower in "Kłodawa" Salt Mine
  • Rectification and reinforcement of "Kinga" shaft hoist tower "Wieliczka" Salt Mine

 
 
 
 

 
 

POWER ENGINEERING
  • Building of combustion gases dust extraction and desulphurizing installations in Jaworzno III Power Plant
  • Building of repair gangs workshop for Jaworzno III Power Plant
  • Modernization and repair of machine hall casing walls of 1,2,3,4,5,6,7,8,9,10 blocks for Turów Power Plant
  • Execution and delivery of electro-filter elements and combustion gases drainage installation to Jaworzno III Power Plant for ELWO S.A.
  • Assembly of 93 sets supervision manholes in boiler no 4 group 241 in Turów Power Plant
  • Gypsum warehouse building for Jaworzno III Power Plant
  • Buildings casing walls replacement for Jaworzno III Power Plant
  • Boiler house north facade repair in Jaworzno III Power Plant
  • Execution and assembly of coal bunkers for block no 2 in Siersza Power Plant
  • Boiler II gas passes delivery for Siersza Power Plant
  • Electro-filter for blocks no 1 and 2 delivery in Siersza Power Plant
  • Steel construction delivery and assembly as well as existing steel construction dismantling of block no 4, B-C bay for Turów Power Plant
  • Boiler stairway steel construction delivery and assembly in Siersza Power Plant
  • Building of Coal Recovery Plant for Rybnik Power Plant

OTHERS
  • Hoist tower repair of "Jerzy" shaft as well as renovation of old machines and equipment in the Silesia City Center area - QUALIFICATION TO "MODERNIZATION OF 2005"
  • Design and execution as "turnkey" project of 10 sport halls near schools in the Rybnik area
  • Anchoring of parapet wall excessively sticked out in St. Cross Church in Bytom
  • Hipermarket Halls of AUCHAN Shopping Centre in Sosnowiec
  • Roca hall in Gliwice
  • "Plastal" Plastic Elements Factory in Gliwice
  • Execution and assembly of gymnasium steel constraction in Gołkowice
  • Execution and assembly of TOYOTA cars room construction in Sosnowiec
  • Sport hall building in Oświęcim
  • Dismantling and assembly of roof hall steel construction in the Upper School of Management and Marketing in Sosnowiec
  • Assembly of lighting masts at MOSiR stadium in Wodzisław Śl.
  • Delivery and assembly of hall steel construction in "Mysław" Meat Plant in Mysłowice
  • CARREFOUR Shopping Centre Nowa Huta in Kraków
  • Volkswagen T5 welding hall in Poznań
  • Hall building for "Błysk" warehouse in Jastrzębie Zdrój
  • Production hall building as „turnkey" project for "Kalmet" in Katowice Special Economical Zone
  • Bell tower building in St. Wojciech Church in Jaworzno


DESIGN WORKS
  • Conveyor bridges repair no 1, 3, 5, 9, 10.2 i 10.3 for „Anna" Coal Mine
  • Assortments loading station repair - object 3.1 Coal Preparation Plant for Lubelski Węgiel "Bogdanka"
  • Fine Coal Concentration Plant for "Piast" Coal Mine i.e.: inside installations object 60 - installation branch, object 55 - electric branch, technical control and move laboratory in object 52, technological pipelines in object 52, cables guidance plan, fitter + goods lift machinery in object 52,
  • Rebuilding of material fed mechanically for crushing and dressing proportioning system for fast coal dumping for "Staszic" Coal Mine
  • No 137 conveyor bridge repair including expertise for "Bolesław Smiały" Coal Mine
  • Building adaptation of previous housings hall for emulsifier as well as oils and lubricates store needs for "Jankowice" Coal Mine
  • Stone haulage with motor transport in "Piekary" Mine Plant
  • Modernization of system I pre-classification of Coal Preparation Plant for "Budryk" Coal Mine
  • Machines hall ventilation on tower shaft no 8 for "Jankowice" Coal Mine
  • No 11 conveyor bridge repair in "Rydułtowy - Anna" Coal Mine
  • Rebuilding of scaleses tanks and pour tank for "Ziemowit" Coal Mine
  • Washer modernization c.c. for „Marcel" Coal Mine
  • Knot modernization of coal dumping in washer building for „Marcel" Coal Mine
  • Winning emergency dump from dip-heading output for "Janina" Coal Mine